-
Chesapeake Beach Rail Trail Feasibility Study (PAMC)
Project Planner Project Description This project is a feasibility and design study for a segment of the planned hard-surface Chesapeake Beach Rail Trail starting at MD 725 (Marlboro Pike) and potentially linking a portion of the planned Western Branch Trail to the Show Place Arena. The primary goal of this study is to provide the…
-
New Carrollton Downtown Access and Connectivity Strategy
-
Flooding & Stormwater Hazard Mitigation Analysis for Brentwood & North Brentwood (PAMC)
Update At a public meeting hosted by the Town of Brentwood on May 01, 2025, consultants Charles P. Johnson and Associates presented the Draft Flooding and Stormwater Hazard and Risk Management Analysis for the Towns of Brentwood and North Brentwood. Project Planner Project Description Located within the Anacostia Watershed along the Northwest Branch of the…